LCETED Institute for Civil Engineers - LCETED

Post Top Ad

Recent Posts

Mar 28, 2025

Mar 24, 2025

How to Prepare a BOQ for Dismantling and Demolition Works? - LCETED

24 March 0
How to Prepare a BOQ for Dismantling and Demolition Works? Preamble for the Dismantling Work Bill of Quantity The rate for all demolishing and dismantling to include carting and disposing of the debris outside the site at approved State/Municipal Dumping grounds as per Project Manager's instruction. Necessary propping, shoring, and/or underpinning shall be provided for the safety of the a…
Read More

Mar 23, 2025

Mar 20, 2025

Flexural Strength Test of Concrete – Procedure & Calculation

20 March 0
Objective To determine the Flexural Strength of Concrete , which is crucial when road slabs experience inadequate sub-grade support, wheel loads, or volume changes due to temperature and shrinkage. Reference Standard IS: 516-1959 – Methods of tests for strength of concrete Equipment & Apparatus Equipment Specifications Beam Mould …
Read More

Mar 13, 2025

What is Lap Length & Development Length? RCC Guidelines You Must Know

13 March 0
Reinforcement Lap Length & Development Length as per IS Codes (IS 456 & IS 13920) Reinforcement lap length and development length are critical for structural stability in RCC (Reinforced Cement Concrete) design. IS 456:2000 and IS 13920:2016 provide guidelines for ensuring proper load transfer and structural integrity . What is Lap Length in Reinforcement? Lap length refers to the …
Read More

LCETED - "WHATSAPP GROUP"

For Instant updates Join our Whatsapp Group. Save our Whatsapp contact +919840140396 as LCETED and Send us a message “JOIN”

Post Bottom Ad