LCETED Institute for Civil Engineers - LCETED

Post Top Ad

Recent Posts

Apr 1, 2025

UPS Testing Guide for Project Managers: Ensure Reliability with On-Site & Factory Tests

01 April 0
A Project Manager’s Guide to UPS Testing: Ensuring Your Power Backup is Bulletproof When you’re procuring a UPS (Uninterruptible Power Supply) system for your project, it’s not enough to just install it and hope for the best. Power outages, surges, or equipment failures can bring your operations to a standstill—unless your UPS is rigorously tested. This article breaks down the essential tests…
Read More

Mar 28, 2025

Mar 24, 2025

How to Prepare a BOQ for Dismantling and Demolition Works? - LCETED

24 March 0
How to Prepare a BOQ for Dismantling and Demolition Works? Preamble for the Dismantling Work Bill of Quantity The rate for all demolishing and dismantling to include carting and disposing of the debris outside the site at approved State/Municipal Dumping grounds as per Project Manager's instruction. Necessary propping, shoring, and/or underpinning shall be provided for the safety of the a…
Read More

Mar 23, 2025

Mar 20, 2025

Flexural Strength Test of Concrete – Procedure & Calculation

20 March 0
Objective To determine the Flexural Strength of Concrete , which is crucial when road slabs experience inadequate sub-grade support, wheel loads, or volume changes due to temperature and shrinkage. Reference Standard IS: 516-1959 – Methods of tests for strength of concrete Equipment & Apparatus Equipment Specifications Beam Mould …
Read More

LCETED - "WHATSAPP GROUP"

For Instant updates Join our Whatsapp Group. Save our Whatsapp contact +919840140396 as LCETED and Send us a message “JOIN”

Post Bottom Ad