Construction Project
Manager Checklist – Essential Pre-Construction & Site Setup Guide
This construction
project manager checklist covers all key aspects, from contractual
agreements and procurement to safety compliance and site logistics. Use this pre-construction
checklist to ensure a smooth workflow and project success.
1.
Contractual Requirements Checklist
- Notice to Proceed received from
the client
- Formal contract agreement signed
and documented
- CAR (Contractor’s All Risk)
insurance policy obtained
- Performance bond or bank
guarantee (BG) secured
- Advance payment bond,
mobilization advance, or retention money arranged
- Earnest Money Deposit (EMD)
returned after bid completion
- Labour license and workman
compensation compliance ensured
- Commercial risk assessment and
feasibility study conducted
- Compliance with BOCW Act
(Building and Other Construction Workers Act) checked
- LEED, IGBC, or other
certification requirements reviewed
2.
Manpower and Workforce Planning
- Project manpower histogram and
organizational chart prepared
- Mobilization plan and
construction project schedule finalized
3. Site
Logistics & Temporary Facilities Setup
- Site logistics plan prepared and
approved
- Utilities provision arranged,
including power and water connections
- Temporary project office set up
for contractors and supervisors
- Secure storage and material
handling areas allocated
- Site QA/QC lab established for
material testing
- Proper restroom and sanitation
facilities installed for workers
- Site notice board displayed with
safety guidelines and project details
4.
Quality Assurance & Quality Control (QA/QC) Compliance
- Project quality plan (PQP)
prepared as per specifications
- NCR (Non-Conformance Report)
logs and reporting formats established
- Material sample approval
schedule coordinated with suppliers
- QA/QC procedures documented and
issued to all teams
5.
Municipal Permits and Government NOCs
- Building permit obtained for design
& build projects
- Enabling works permit and
temporary structures approval secured
- Waste disposal and debris
management permit obtained
- Local police department contact
established for security coordination
- Waste management and
environmental impact plan reviewed
- Health and safety registration
completed as per local regulations
- Pest control measures
implemented to maintain site hygiene
- Transit insurance arranged for
high-value equipment
- Provident Fund (PF) and ESIC
compliance ensured for labor welfare
- Compliance with Minimum Wages
Act verified
6.
Procurement and Supply Chain Management
- Long lead items identified to
prevent delays
- Port facilities and shipping
logistics arranged (if applicable)
- Port clearance and import
documentation completed for imported materials
- Pre-qualified suppliers
shortlisted for each package
7.
Construction Drawings and Design Data
- Construction drawing requirement
list submitted to the client
- Expected receipt schedule for
construction drawings planned
- Shop drawings, mock-ups, and
sample approvals scheduled
- Additional design requirements
identified and addressed
- As-built drawings schedule
prepared (if applicable)
8.
Sub-Contractor Management & Agreements
- Sub-contractors listed and
verified for compliance
- Contract agreement format
finalized and signed
- Sub-contractor mobilization and
commencement schedule defined
9.
Health, Safety, and Environmental (HSE) Compliance
- Comprehensive HSE plan
developed and reviewed
- High-risk activities identified
and Work Method Statements (WMS) prepared
- Hazard evaluations conducted to
mitigate risks
- Emergency service providers and
hospitals identified near the site
- Emergency egress routes and
assembly areas determined and marked
10.
Financial & Project-Specific Requirements
- Cash flow diagram prepared for
budget monitoring
- Tender breakdown received and
reviewed for accuracy
- Additional project-specific
requirements documented
Conclusion: Why This
Construction Checklist is Mandatory
A perfectly
organized construction project manager checklist forms the backbone of a
successful venture. With adherence to this checklist, you will be able to:
✔
Secure compliance with legislation, safety standards, and quality requirements
✔
Simplify planning for the project with adequate manpower, procurement, and
logistics arrangements
✔
Optimize risk management and delays with advance permits, approvals, and
insurance
✔
Enhance efficiency on site by maintaining proper records, subcontract
management, and HSE practices
Whether
you're coordinating a commercial, residential, or infrastructure project, this
checklist will keep you in order, on time, and within budget.
Bookmark
this checklist, send it to your team, and use it on all your future projects!