Construction Project Manager Checklist – Essential Pre-Construction & Site Setup Guide

Construction Project Manager Checklist – Essential Pre-Construction & Site Setup Guide

This construction project manager checklist covers all key aspects, from contractual agreements and procurement to safety compliance and site logistics. Use this pre-construction checklist to ensure a smooth workflow and project success.


1. Contractual Requirements Checklist

  • Notice to Proceed received from the client
  • Formal contract agreement signed and documented
  • CAR (Contractor’s All Risk) insurance policy obtained
  • Performance bond or bank guarantee (BG) secured
  • Advance payment bond, mobilization advance, or retention money arranged
  • Earnest Money Deposit (EMD) returned after bid completion
  • Labour license and workman compensation compliance ensured
  • Commercial risk assessment and feasibility study conducted
  • Compliance with BOCW Act (Building and Other Construction Workers Act) checked
  • LEED, IGBC, or other certification requirements reviewed

2. Manpower and Workforce Planning

  • Project manpower histogram and organizational chart prepared
  • Mobilization plan and construction project schedule finalized

3. Site Logistics & Temporary Facilities Setup

  • Site logistics plan prepared and approved
  • Utilities provision arranged, including power and water connections
  • Temporary project office set up for contractors and supervisors
  • Secure storage and material handling areas allocated
  • Site QA/QC lab established for material testing
  • Proper restroom and sanitation facilities installed for workers
  • Site notice board displayed with safety guidelines and project details

4. Quality Assurance & Quality Control (QA/QC) Compliance

  • Project quality plan (PQP) prepared as per specifications
  • NCR (Non-Conformance Report) logs and reporting formats established
  • Material sample approval schedule coordinated with suppliers
  • QA/QC procedures documented and issued to all teams

5. Municipal Permits and Government NOCs

  • Building permit obtained for design & build projects
  • Enabling works permit and temporary structures approval secured
  • Waste disposal and debris management permit obtained
  • Local police department contact established for security coordination
  • Waste management and environmental impact plan reviewed
  • Health and safety registration completed as per local regulations
  • Pest control measures implemented to maintain site hygiene
  • Transit insurance arranged for high-value equipment
  • Provident Fund (PF) and ESIC compliance ensured for labor welfare
  • Compliance with Minimum Wages Act verified

6. Procurement and Supply Chain Management

  • Long lead items identified to prevent delays
  • Port facilities and shipping logistics arranged (if applicable)
  • Port clearance and import documentation completed for imported materials
  • Pre-qualified suppliers shortlisted for each package

7. Construction Drawings and Design Data

  • Construction drawing requirement list submitted to the client
  • Expected receipt schedule for construction drawings planned
  • Shop drawings, mock-ups, and sample approvals scheduled
  • Additional design requirements identified and addressed
  • As-built drawings schedule prepared (if applicable)

8. Sub-Contractor Management & Agreements

  • Sub-contractors listed and verified for compliance
  • Contract agreement format finalized and signed
  • Sub-contractor mobilization and commencement schedule defined

9. Health, Safety, and Environmental (HSE) Compliance

  • Comprehensive HSE plan developed and reviewed
  • High-risk activities identified and Work Method Statements (WMS) prepared
  • Hazard evaluations conducted to mitigate risks
  • Emergency service providers and hospitals identified near the site
  • Emergency egress routes and assembly areas determined and marked

10. Financial & Project-Specific Requirements

  • Cash flow diagram prepared for budget monitoring
  • Tender breakdown received and reviewed for accuracy
  • Additional project-specific requirements documented

 

Conclusion: Why This Construction Checklist is Mandatory

A perfectly organized construction project manager checklist forms the backbone of a successful venture. With adherence to this checklist, you will be able to:

Secure compliance with legislation, safety standards, and quality requirements

Simplify planning for the project with adequate manpower, procurement, and logistics arrangements

Optimize risk management and delays with advance permits, approvals, and insurance

Enhance efficiency on site by maintaining proper records, subcontract management, and HSE practices

Whether you're coordinating a commercial, residential, or infrastructure project, this checklist will keep you in order, on time, and within budget.

 

Bookmark this checklist, send it to your team, and use it on all your future projects! 