Change Authorization Request Form: An Essential Tool for Project Managers
A Change Authorization Request (CAR)
form documents, approves, and tracks changes for a given project. Changes on
projects are pretty common; in construction or interior design, the needs of a
client may be changed, site conditions may require changes, or other factors.
It ensures that all changes are valued, approved, and documented appropriately
to handle project scope, cost, and schedule.
Table: Example of a Change Authorization
Request Form
Project
Information |
Details |
Project |
|
Client |
|
Date |
|
CAR no. |
|
Package |
|
Purchase Order |
|
Contractor's Name |
|
Change
Request Details |
Details |
S.No |
|
Department |
|
CO/CA NO |
|
Date Initiated |
|
BOQ No (Details) |
|
Description |
|
Reason for Change |
|
Pricing Method |
|
UOM |
|
BOQ Qty (c) |
|
Substitute Item/Quoted Rate (a) |
|
Substitute / Quoted Amount (A = a x c) |
|
Actual Qty (c) |
|
Change Item Rate (b) |
|
Change Item Amount (B = b x c) |
|
Variation Cost Grand Total (B-A) |
|
Architect Comment |
|
Approval Status |
|
Approval Date |
|
Key Components of the Table
- Project
Information:
·
Project, Client, Date: The
field shows which project the change authorization request is for, the client,
and the date.
·
CAR no., Package, Purchase
Order: CAR Number- uniquely identify the change
request; Package refers to particular part of the project, i.e., "Civil
& Interior"; Purchase order, original contract of the work.
·
Contractor's Name: name
of the contractor responsible for the project works.
- Change
Request Details:
·
S.No: Serial
number of the Change request.
·
Department: The
department responsible for the change, such as Civil, Electrical.
·
CO/CA NO: Change
Orders or Change Authorization Numbers for changes identified in the Contract.
·
Date Initiated: Date
on which the change request was initiated.
·
BOQ No (Details): Bill
of Quantities reference number showing details of items being varied.
- Description
and Reason for Change:
·
Description: A
brief description of the change being requested.
·
Reason for Change: Justification
for why the change is necessary (e.g., design alterations, site conditions,
client requests).
- Cost
and Quantity Assessment:
·
Pricing Method: This
shall define the basis of pricing; whether it is a lump sum or unit rate. UOM:
Unit of Measure, e.g., square meters,
·
UOM: Unit
of Measure, such as square meters, kilograms, etc.
·
BOQ Qty (c): The
quantity of the item as per the original Bill of Quantities.
·
Substitute Item/Quoted Rate
(a): The rate quoted for the substitute item or
the changed scope.
·
Substitute / Quoted Amount
(A = a x c): The total cost based on the quoted rate
and quantity.
·
Actual Qty (c): This
is the actual quantity of work done or material utilized.
·
Change Item Rate (b): The
rate for the changed item or scope.
·
Change Item Amount (B = b x
c): The total cost after the change is made.
·
Variation Cost Grand Total
(B-A): Difference in cost before and after the
change.
- Comments,
Approval, and Finalization:
·
Architect Comment:
Comments or recommendations from the project's architect or project manager.
·
Approval Status:
Indicates whether the change has been approved, rejected, or is pending.
·
Approval Date:
The date when the change was officially approved.
Uses of the Change Authorization Request
Form
For a project manager, the CAR form is an
indispensable tool for several reasons:
·
Change Documentations: It
provides a formal way of documenting each requested change in detail and allows
the tracking of each modification made, thus enabling clear history maintenance
of the project.
·
Budget Control: The
form aids in the financial assessment of each variation. The project manager
can contrast the original BOQ amounts against the proposed changes to know how
the change will affect the overall budget.
·
Scope Management: The
form will help in managing the scope of the project under consideration,
ensuring each and every change is reviewed, approved, and accounted for. This
will avoid uncontrolled changes that might expand the project beyond its
original objectives.
·
Approval Process: Ensuring
all changes have formal approval from the appropriate stakeholders before
implementation. Verification for unauthorized changes saves undue expenditure
from the budget or waste of time due to the effect of the change.
·
Input from Other
Department: The input is required from the cost
estimator, architect, contractor, etc.; hence, in this sense, the CAR form acts
as an instrument of communication and coordination among all concerned parties
in a project.
·
Risk Management: The
potential risks of changes on the CAR form are delay, increased cost, and its
effect on other elements in the project.
When to Use the Change Authorization Request
Form
·
During Project Execution: When
any change in scope, materials, or methods is proposed after the project has
begun.
·
For Client-Requested
Changes: When the client requests modifications to
the original project plan or design.
·
When Unforeseen Conditions
Arise: If unexpected site conditions require
changes to the project scope or design.
·
For Regulatory Compliance: When
changes are needed to comply with new regulations or standards.
Also Read: Managing
Change Orders in Construction: A Comprehensive Guide
Conclusion
The
Change Authorization Request form is one of the most important tools in the
hands of the project manager for ensuring systemic control and documentation of
changes. By managing the change requests carefully, project managers can keep
the projects on course, within budget, and focused on the client's objectives.
Proper utilization of this form will help a project in scope and cost
management, but it also plays a very important role in risk management and
stakeholder communication.
Frequently
Asked Questions (FAQ)
1.
What is a Change Authorization Request (CAR) form?
A
CAR form is a project management document used to propose, assess, approve, and
track alterations made in the project scope, budget, or timeframe. It ensures
that all changes in the project are documented, reviewed, and approved before
implementation.
2.
Why is a Change Authorization Request form important in construction projects?
The
given CAR form is essential in construction projects, as it covers variations
in scope and maintains costs without causing delays. Additionally, the fact
that changes are recorded will yield a trace of why such modifications were
done, who approved the modifications, and how they affected the entire project.
3.
When should I use a Change Authorization Request form?
You
should make use of the CAR form when there is a need to deviate from the
original plan of the project. This could be because any requested changes by
the client, the need for adjustments because the conditions found on-site are
not as assumed, or to change something that does not meet a new regulation or
standard.
4.
How does a Change Authorization Request form help in budget control?
CAR
form It aids in cost management by setting original BOQ amounts against
proposed changes, which are done by establishing the calculated financial
effect of the change thus making it sure that all changes in costs are recorded
and approved before the work goes on.
5.
What information is required in a Change Authorization Request form?
A
standard CAR form would include the project details, description of the
variation, its reason, cost and quantity estimates, and approval status. It may
also take inputs from different departments like project manager, architect,
and contractor.
6.
How can a Change Authorization Request prevent scope creep?
It
does prevent scope creep. The CAR form prevents scope creep since it documents
every change formally and acquires approval for the changes. This process
prevents any expansion of project scope that has not been mutually agreed upon,
preventing a drain on the budget or time delay from budget overruns or delays.
7.
Who approves a Change Authorization Request in a project?
Generally,
approval of a CAR requires the project manager, client, and sometimes other
stakeholders such as the architect or financial controller. The form documents
who has reviewed and approved the change for accountability.
8.
What are the potential risks if a Change Authorization Request is not used?
The
severe risks a project is exposed to in the absence of using a CAR are
unmanaged changes, possibly leading to cost overruns, project delays, and scope
creep. These unauthorized additional works may also lead to disputes with the
clients or contractors due to the lack of proper documentation and approval.
9.
Can a Change Authorization Request form be used in all types of projects?
Yes,
while commonly used in construction and interior design projects, a CAR form
can be adapted for any project that requires managing changes to scope, budget,
or timelines, such as IT projects, product development, or event planning.
10.
How does using a Change Authorization Request form improve communication in a
project?
The
CAR form helps in improving communication by involving all the parties
concerned in the process of change approval. It enables all parties to be
informed of the proposed changes, their implications, and the status-which
guarantees transparency and cooperation.