Types of Testing and Commissioning in Electrical Construction Works - Lceted

Testing and Commissioning in Electrical Construction Works | Electrical Installation Factory Acceptance testing (FAT) | Electrical Installation Site Acceptance testing (SAT) | Electrical Test Reports in Excel Sheet | Electrical Package List of Tests 

 

In this article, We have listed out Types of Electrical Installation Testing and Commissioning on factories and Sites for construction works and Test Instrumentation Required/Considered For Site Acceptance Testing (SAT)


Types of Electrical Installation

 

Following are the Electrical tests that shall be carried out on the construction works

 

Electrical Systems - DB's

1. Physical inspection and specs. Verification

2. Megger – Insulation resistance to be verified

3. Continuity test

4. Voltage Checks

5. Phase Sequence and polarity test

6. Earth Loop impedance test

 

Electrical Systems - Power Sockets (Desktop Modules UPS + Raw Power)

1. MCB Operation & RCBO Trip test with trip time

2. Circuit Tracing

3. Circuit Megger

4. Voltage Checks

5. Polarity Check

6. Earth Loop impedance test

7. Load test (with lamp load)

 

Electrical Systems - Earthing System

1. Physical inspection and specs. Verification

Individual earth pit resistance measurement

2. Parallel earth pit resistance measurement as per drawing

3. Earth loop impedance measurement: To be measured on the floor

4. Earthing cable tracing & continuity verification

 

Electrical Systems -Lighting System

1. Physical inspection and specs. Verification

2. Circuit Tracing: Each lighting circuit is to be traced and verified as per the drawing

3. Verification Sensors: Each sensor occupied as per design in closed cabins and periphery is to be verified for its operation as per the set time delay and exposure to light

4. Lux level measurement- Normal & emergency light lux level verifications.

5. LMS Verification: LMS System is to be verified as per approved Logic.

 

Electrical Systems - Inverter System

1. Physical inspection and specs. Verification

2. Display Panel / Alarm checks and CBS operation

3. Battery Backup time verification on rated load

4. Battery Voltage Verification


Following are the Test Instrumentation Required/Considered For Site Acceptance Testing (SAT) of Electrical Works

1. 3-Phase Power Quality Analyzer

2. True RMS Multi-meter

3. True RMS Clamp meter

4. Insulation resistance tester (0-1000V)

5. Phase sequence meter

6. Digital thermographic scanner

7. Earth loop impedance tester

8. RCBO/RCD Trip test kit

9. Socket Polarity Test kit

10. Lux Meter

11. Lamp test kit for power sockets

12. Earth Pit tester

13. External Load Bank (Inverter Load testing)


Test Instrumentation Required Electrical Works



CLICK TO DOWNLOAD EXCEL SHEET

Testing and Commissioning in Electrical Construction Works