Quality inspection checklist for Electrical works –
Installation of wiring
Item of Work: Installation of Wiring
1. Sizes and quality of material as per drawing &
specification.
2. Containment (conduits/raceways) provided as per
approved layout drawing.
3. The maximum no of wires in a conduit is as per spec.
4. No joints in the wiring. Joints are allowed only at
the switchboards and equipment end.
5. (In unavoidable situations only) connector
provided for joint.
6. Ferrules provided on the wires at switch board, DB,
and equipment end
7. Merging is done on wires before connecting to the
equipment.
8. Color coding followed as per spec.
9. PVC sleeve used for running copper wires through
workstations. (Not applicable if sheathed cables are used)
QUALITY
INSPECTION CHECKLIST FOR ELECTRICAL WORKS |
|
||||||
Project: |
Date: |
|
|||||
Name of Contractor: |
Location: |
|
|||||
|
|
|
|||||
Item of Work:
Installation of Wiring |
|
||||||
S.No |
Item
description |
YES |
NO |
NA |
Remarks/
Corrective Action |
|
|
Start of work |
|
||||||
1 |
Sizes and quality of material as per drawing &
specification. |
|
|
|
|
|
|
2 |
Containment (conduits/raceways) provided as per
approved layout drawing. |
|
|
|
|
|
|
3 |
The maximum no of wires in a conduit is as per spec. |
|
|
|
|
|
|
4 |
No joints in the wiring. Joints are allowed only at the switchboards and equipment end. |
|
|
|
|
|
|
5 |
(In unavoidable situations only) connector provided for joint. |
|
|
|
|
|
|
6 |
Ferrules provided on the wires at switch board, DB, and
equipment end |
|
|
|
|
|
|
7 |
Meggering is done on wires before connecting to the
equipment. |
|
|
|
|
|
|
8 |
Color coding followed as per spec. |
|
|
|
|
|
|
9 |
PVC sleeve used for running copper wires through workstations. (not applicable if sheathed cables are used) |
|
|
|
|
|
|
10 |
Wires/cables bunched properly in raceways. |
|
|
|
|
|
|
Project Manager:
Consultant: Contractor: |
|
||||||