Quality Inspection Checklist for Flooring and screeding works | Floor Screeding Inspection Checklist
Start of work
Are the layout marking and
floor levels verified?
Is the subbase cleaned
before taking up the laying of the screed?
Are the material grades as
per the specifications?
Are the conduits, raceways, and junction boxes laid as per the requirement?
Is the level of raceways
and junction boxes verified? (Is there adequate clearance on top of the
raceways for the adherence of the screed?)
Execution
Is the screeding being done
uniformly?
Is the mix of the screed as
per the specifications?
Completion of work
Have the levels of the
finished floor been checked before the setting of the screed?
Is the finished floor being
cured adequately?
Is the level of the
junction boxes in line with the finished floor level?
Is the position of output
cables and wire entry in place?