The preliminary phase of construction is necessary to analyze, plan, design and establish the requirements for the construction of the project before the actual construction begins. The pre-construction objective is to ensure that the plan is clearly defined in every detail and is feasible for all parties involved in all aspects of construction. Your goal is to ensure that everyone on the team has what it takes to make the project successful, operationally, and financially viable.
Below You can find the Preliminary Stage of construction Checklist for civil
engineers
1. Preliminary Stage of construction - Preparatory Steps
(a) Secure copies of
(1) Contract documents: a. General
conditions, b. Specifications and c. Drawings
(2) Reference specifications
(3) Codes
(4) Permits
(5) Insurance certificates
(6) Contractor's contracts
(b) Discuss the entire project with
(1) Architect: Design and Effects
desired
(2) Contractor: Job conditions
(c) Determine
(1) Basis of contract: Lump sum, Cost plus a percentage, Cost plus a
fixed fee and guaranteed upset cost including fixed fee
(2) Interpretation of
contract:
Authority and/or procedure for: Changes and Additions
Rejection of: Materials, Work, Work in place
Dismissal of incompetent workmen
Claims: Delay, Damages, Accidents
Termination of contracts: Bonus or penalty
(3) Unit prices: Materials and
Labor
(4) Quality of Material and Work
(d) Verify the selection of
(1) Testing laboratories
(2) Subcontractors
(e) List
(1) Omissions, discrepancies
(2) Requirements, special or
unusual
(3) Materials: Samples
Certificates, manufacturer's Guaranties, manufacturer's Tests, laboratory, plant,
and field: Inspections Reports
(4) Follow-up schedule for
shop drawings: Submitted And Approved
2. Schedule of Progress - Preliminary
Stage of construction
[Note. Hereafter the word "check"
is to be understood to precede each item.]
(a) Full-sized details, architect's
(b) Inspections and approvals of materials
and work prior to concealment
(1) Dates for
(2) Notification to the architect
3. Examination of Site - Preliminary
Stage of construction
(a) Preliminary items
(1) Detailed surveys
(2) Subsoil conditions
(3) Removal of existing
structures
(b) Protection of
(1) Existing Construction
(2) Adjacent construction:
Shoring, Needling and Underpinning
(3) Trees or shrubs
(4) Utilities and service
lines
(5) Sidewalks
(c) Opening of streets
(d) Water supply
(e) Location of
(1) Structure on lot
(2) Storage of materials
(3) Field Office
4. Layout - Preliminary Stage
of construction
(a) Grades and property lines
(b) Utility lines
(1) Existing
(2) Proposed
(c) Angles and dimensions of structure
(d) Protective measures (as demanded by
state or municipal laws, ordinances, or regulations) for
(1) Workmen (safe equipment,
scaffolding, ladders)
(2) Public (barriers, lights)
(3) Work (covering)
(e) Facilities for close inspection
(f) Settling tests, periodic
(g) Location of sample walls
(1) Masonry
(2) Stone
(3) Other
5. Storage of Materials and
Equipment - Preliminary Stage of construction
(a) Placement on-premises to afford
(1) Protection from Elements and
Vandalism
(2) Inspection accessibility
(b) Contractor's organization
(1) Tools and equipment
(2) Hazard precautions for Workmen, Public and Work
6. Inspection of Work - Preliminary
Stage of construction
(a) Reference data
(1) Specifications and
methods, manufacturer's
(2) Shop drawings,
fabricator's
(3) Full-sized details,
architect's
(4) Reports of Inspections, mill or plant Tests, laboratory or field
(b) Materials, building units, prefabricated
constructions
(1) Kinds, grades, quality
(2) Sizes, shapes, weights
(3) Workmanship and
conformance to details
(4) Absorption and moisture
content
(5) Physical condition
(6) Paint or priming,
shop-coat
(c) Periodic lists
(1) Items not finished: For
adjustment and For withheld-payment
(2) Removals: Work in place
(for correction) and Rejected materials
(d) Notifications to the contractor
(1) Materials, unacceptable
(2) Workmanship, unacceptable
7. File Records - Preliminary
Stage of construction
(a) Reports of progress: daily,
weekly, monthly (summary to determine)
(1) Degree of completion of
work
(2) Proportionate cost of
completed structural elements
(3) Breakdown schedule for
lump-sum contract: Work categories and Contractor's administrative expense
(4) Delivery and acceptance:
Materials, Building units and Prefabricated constructions
(5) Work in place: Operation
of temporary heating, Wetting of materials or surfaces, Curing methods, Protection
or covering after placement, Shoring, Forming and Workmanship
(b) Photographs of progress
(1) Weekly
(2) Monthly
8. Sample Constructions and
Advance Tests - Preliminary Stage of construction
(a) Time allowance for preparation, inspection,
and approval
(1) Mixes of concrete
(2) Masonry: Units and Mortars
(3) Walls, sample
(4) Compounds: Waterproofing, Damp
proofing and Calking
(5) Paints, priming