Pile under footing (pile‐cap) Quantity Survey | Volume Of Concrete | Area Of Shuttering | Area Of Bitumen Paint - LCETED - LCETED Institute for Civil Engineers

Post Top Ad

Nov 5, 2021

Pile under footing (pile‐cap) Quantity Survey | Volume Of Concrete | Area Of Shuttering | Area Of Bitumen Paint

Pile‐under footing (pile‐cap) Quantity Survey | Volume Of Concrete | Area Of Shuttering | Area Of Bitumen Paint

 

1. Pile‐under footing (pile‐cap) Volume Of Concrete Calculation

2. Pile‐under footing (pile‐cap)  Area Of Shuttering Calculation

3. Pile‐under footing (pile‐cap)  Area Of Bitumen Paint Calculation

 

Pile‐under footing

 

 

Pile Dimension:

Ø = 0.50m

height = 3.5m

 

Solution:

1. Volume of Concrete = Area x Depth

= π/4 x d2 x D

= π/4 x 0.52 x 3.5

= 0.687 m3

 

2. Shuttering Area = Peripheral Length x Depth

= 2 x π x r x D

= 2 x π x 0.25 x 3.50

= 5.49 m2

 

3. Bitumen paint Area = peripheral length x Depth + bottom area

= 2 x π x r x D + π/4 x d2

= 2 x π x 0.25 x 3.50 + π/4 x 0.52

= 5.68 m2


Must read: Plain Footing Quantity Survey | Volume Of Concrete | Area Of Shuttering | Area Of Bitumen Paint


Must read: Plain Combined Footing Quantity Survey | Volume Of Concrete | Area Of Shuttering | Area Of Bitumen Paint


Must read: Shoe footing Quantity Survey | Eccentric Footing | Volume Of Concrete | Area Of Shuttering | Area Of Bitumen Paint


Must read: Raft footing Quantity Survey | Volume Of Concrete | Area Of Shuttering | Area Of Bitumen Paint


Must read: Step footing Quantity Survey | Volume Of Concrete | Area Of Shuttering | Area Of Bitumen Paint


Must read: Combined Isolated footing Quantity Survey | Volume Of Concrete | Area Of Shuttering | Area Of Bitumen Paint 


If you find 


This information is helpful, please share it.

 

Thanks! For reading the article...

No comments:

Post a Comment

LCETED - "WHATSAPP GROUP"

For Instant updates Join our Whatsapp Group. Save our Whatsapp contact +919840140396 as LCETED and Send us a message “JOIN”

Post Bottom Ad