IMPORTANT RATE CONVERSION | CIVIL ENGINEERING | CONSTRUCTION | LCETED - LCETED - LCETED Institute for Civil Engineers

Post Top Ad

Nov 2, 2021

IMPORTANT RATE CONVERSION | CIVIL ENGINEERING | CONSTRUCTION | LCETED

IMPORTANT RATE CONVERSION | CIVIL ENGINEERING | CONSTRUCTION

 

Problem-1 : if Rate/ft = 12 rupees; what will be Rate/m = ?

 

Solution:

Method-1:

Since 1 m = 3.28 ft

= 12 x 3.28

= 39.36 or approximately equal to 40 rupees / m

 

Method-2:

1ft = ? m

Since 1m 3.28 ft

= 1/3.28

= 0.304 m

Since 1ft = 0.304 m

= 0.304 m = 12 rupees

= 1 m = ?

= (1/0.304) x 12

= 39.47 or approximately equal to 40 rupees / m

 

Problem-2 : Rate/Sft = 25 rupees Rate/m2 = ?

 

Solution :

Method-1:

Since 1 m = 3.28 ft

= 25 x 3.282

= 268.96 or approximately equal to 269.0 rupees / m2

 

Method-2:

1ft2 = ?  m2 Since 1m 3.28 ft

= 1/3.282

= 0.0929 m2

Since 1ft2 = 0.0929 m2

= 0.0929 m2 = 25 rupees

= 1 m2 = ?

= (1/0.0929) x 25

= 269.0 rupees / m2

 

Problem-3 : Rate/Cft = 55 rupees Rate/m3 = ?

 

Solution

Method-1:

Since 1 m = 3.28 ft

= 55 x 3.283

= 1940.81 or approximately equal to 1941.0 rupees / m3

 

Method-2:

1ft3 = ?  m3 Since 1m 3.28 ft

= 1/3.283

= 0.02833 m3

Since 1ft3 = 0.02833 m3

= 0.02833 m3 = 55 rupees

= 1 m3 = ?

= (1/0.02833) x 55

= 1941.40 rupees / m3


If you find 


This information is helpful, please share it.

 

Thanks! For reading the article...



No comments:

Post a Comment

LCETED - "WHATSAPP GROUP"

For Instant updates Join our Whatsapp Group. Save our Whatsapp contact +919840140396 as LCETED and Send us a message “JOIN”

Post Bottom Ad