INSPECTION CHECKLIST FOR COLUMN CONCRETING
FORM/FORMAT | Checklist no. |
Title: Checklist For Column Concreting. | Rev. , dated
|
Building Location Date.
Grade of concrete=
M Grade of steel =
Activity - Column Starter.
Acceptance Criteria - Shall be free of honeycombing, the edge is not broken & laitance removed with the coarse aggregate top exposed compulsorily.
Observation –
Activity - Provision of Rebar (dia. &qty.), + dowels if any
Acceptance Criteria - As per Column schedule As per RCC Drg. No_______, Rev. No.:________
Observation –
Activity - Position of Rebar. (Lapping, the spacing of stirrups with 45-degree legs & master ring).
Acceptance Criteria - As per General drawing. As per RCC Drg.
No.:_______, Rev. No.:________
Observation –
Activity - Clear Cover of Rebar.
Acceptance Criteria - Shall be provided of 55mm & 40mm, for below ground & above ground respectively,with a + 5 mm tolerance.
Observation –
Activity - Position of topmost stirrup of the column.
Acceptance Criteria - Shall be placed at 40mm below concreting top.
Observation –
Activity - Position of guide/master stirrup above concreting level.
Acceptance Criteria - Shall be provided at Min. 600mm & Max. 1000mm. from the concrete top.
Observation –
Activity - Space of needle vibrator, insertion, for concreting works.
Acceptance Criteria - Shall be Min. 70mm gap to suit 60mm needle vibrator & Min 50mm gap to suit 40mm needle vibrator
Observation –
Activity - Binding wire knots & tail
Acceptance Criteria - Shall not be in Clear cover zone.
Observation –
Activity - Shuttering works
Acceptance Criteria - Soldiers shall be provided after every panel for column length more than 750mm. 1st tie rod shall be at 125mm from bottom. Window shall be provided for column height more than 1400mm. Wedge clips shall be at 150mmc/c. back to back angle Yokes shall be provided at each tie rod level. Raker props shall be supported on a firm base.
Observation –
Activity - Provision of Empty cement bag below the shuttering panel.
Acceptance Criteria - No gap shall be seen, in space between shuttering panel bottom & slab top.
Observation –
Activity - Starter/ Column dimension (width, length, right angle, line & plumb).
Acceptance Criteria - As per Drawing. Dwg No.__________
Rev. No.:________
Observation –
Activity - Column top concreting level.
Acceptance Criteria - As per Drawing. Dwg No.__________
Rev. No.:________
Observation –
Activity - Working platform.
Acceptance Criteria - Shall be supported on H frame with atleast27” wide platform.
Observation –
Activity - Tools & materials for
Acceptance Criteria - making cement slurry, & trey for Concreting 2 G.I. buckets, 1 ltr. Cylinder, 500 ml bottle for plasticizer & rod for stirring
Observation –
Activity - Two nos. electrical vibrator, one no. petrol vibrator & spare needle.
Acceptance Criteria - Available near columns
Observation –
Note All dwg numbers, to be referred should be filled in, before the Checklist is referred to, at the location, for Acceptance Criteria, by the Senior Engineer/Sector Engineer.
FOREMAN: _________________________
JR.ENGR/SITE ENGINEER: _______________
SENIOR/SECTOR ENGINEER: ______________
NB: Checklist, to be completed in all respects and signed with the date by all concerned, as designated above.
LCETED INSTITUTE FOR CIVIL ENGINEERS