BRICK
A brick is building the material used to make walls, pavements and other elements in masonry construction.
.
Checklist For Brick Masonry Wall Construction
1. Use first-class bricks for the wall construction.
2. Ensure that brick courses are perfectly horizontal.
3. The site engineer should ensure the verticality of the wall by frequently checking with plumb-bob.
4. Whenever brickwork stopped the wall should be left with the toothed end.
LCETED TRIVIA FOR CIVIL ENGINEERS
5. Raising walls by more than 1.5 m in one day shall be prevented.
“LCETED Alert for Civil Engineers” Download this Image for your daily use
7. Raise face joints to a depth of 12 to 20mm so as to be used as a key for plastering or pointing.
8. Brick masonry should be regularly cured for 2 weeks.
9. The thickness of mortar joints shall be 10 mm, both horizontally and vertically.
“LCETED Alert for Civil Engineers”
Download this Image for your daily use
.
Brick Masonry Construction Procedure
1. Initially, mix the mortar Ratio (1:5 or 1: 6) with water and blend it.
2. After that, place the mortar on foundation line evenly using a trowel 25mm thickness and one brick wide is recommended for laid mortar.
4. Then, lay the first-class bricks in the mortar. Start with second brick, apply mortar to the head joint end of each brick,
5. After that shove the bricks into place firmly so that the mortar is squeezed out of all side of the joints.
6. Ensure that bricks are plumb and level.
7. Place another mortar line alongside the first course, then begin laying the second course.
8. you can select any type of brick bonds. to proceed next step
LCETED TRIVIA FOR CIVIL ENGINEERS
.
9. We Use the two half bricks (English bond) to begin the second to ensure that the first two courses are staggered for structural purposes.
10. To finish the second course of the lead, lay the first class bricks and make sure that they are plumb and level.
11. Lastly, this pattern of bricklaying is used until the target height is reached.
LCETED TRIVIA FOR CIVIL ENGINEERS WE HOPE YOU UNDERSTAND OUR ARTICLE ON BRICKWORK CALCULATION. IF YOU WANT MORE UPDATES PLEASE PRESS THE BELL ICON
LCETED SUGGESTS YOU READ THIS TOPIC ALSO
LCETED - "WHATSAPP GROUP"
For Instant updates Join our Whatsapp Group. Save our Whatsapp contact +919840140396 as LCETED and Send us a message “JOIN”